Moving Bristol Forward
PRE-FEASIBILITY STUDY Building on the TfGB Rapid Transit Plan to propose a Primary Tram Network Phased over 10-15 years
LIGHT RAIL (UK)
Browse reports, articles, presentations, project information and historical material.
ARCHIVE
PRE-FEASIBILITY STUDY Building on the TfGB Rapid Transit Plan to propose a Primary Tram Network Phased over 10-15 years
What We Can Do for Bristol LRT Whereas we can provide trackwork, power distribution, and signaling systems we believe that the concept for Bristol is to have and benefit from the environmental sustainability and technical advantage of a 21st-century Ultra Light Self Powered Tram System. This means t...
This document supports a previous document, Integrating Trams on the Gloucester Rd Feb 2026 and brings together the strategic tram proposition for the Gloucester Road (A38) starter line and the Hydrogen-Transport-as-a-Service (HTaaS) model into a single, unified briefing. It sets out how Very Light...
The Ashton Gate to Temple Meads preserved light rail route is proposed as the first section of a rail based Rapid Transit Network for Bristol. A high quality frequent service will reduce traffic on Hotwells Road while serving the Ashton Gate, Hotwells, Southville/Ashton, South Harbourside and Redcli...