ARCHIVE

6 results

Clear filters
Bristol

Moving Bristol Forward

PRE-FEASIBILITY STUDY Building on the TfGB Rapid Transit Plan to propose a Primary Tram Network Phased over 10-15 years

Archive ID: 1058
Bristol

Bristol Stefconfer Track 2a

What We Can Do for Bristol LRT Whereas we can provide trackwork, power distribution, and signaling systems we believe that the concept for Bristol is to have and benefit from the environmental sustainability and technical advantage of a 21st-century Ultra Light Self Powered Tram System. This means t...

Archive ID: 1235
Bristol

Bristol WECA What is lost by going BRT Feb 2026

Archive ID: 1368
Bristol

Bristol; Gloucester Road

This document supports a previous document, Integrating Trams on the Gloucester Rd Feb 2026 and brings together the strategic tram proposition for the Gloucester Road (A38) starter line and the Hydrogen-Transport-as-a-Service (HTaaS) model into a single, unified briefing. It sets out how Very Light...

Archive ID: 1370
Bristol

Proposed Tramway: Bristol Nov 2010 (Revised)

The Ashton Gate to Temple Meads preserved light rail route is proposed as the first section of a rail based Rapid Transit Network for Bristol. A high quality frequent service will reduce traffic on Hotwells Road while serving the Ashton Gate, Hotwells, Southville/Ashton, South Harbourside and Redcli...

Archive ID: 763